top of page

ASSET SPECIFICATIONS

Lewek Emas FPSO

  • Current deployment: Chim Sao field, Vietnam

  • Flag: Singapore

  • Build year: 1978 (USA)

  • FPSO conversion: 2011 (Singapore)
     

  • Oil production capacity: 50,000 b/d

  • Water production capacity: 50,000 b/d

  • Gas production capacity: 48.0 mmscf/d

  • Total storage capacity: 683,024 bbls

Full technical specifications can be found here

Lewak Emas FPSO 1.jpg
West Desaru MOPU 3.jpg

West Desaru MOPU

  • Current deployment: West Desaru field, Malaysia

  • Flag: Cook Island

  • Build year: 1976 (USA)

  • MOPU conversion: 1999 (USA)

  • Refurbishment: 2012 (Malaysia)
     

  • Oil production capacity: 20,000 b/d

  • Water treatment capacity: 40,000 b/d

Full technical specifications can be found here

 

Jasmine FPSO

  • Current deployment: Jasmine field, Thailand

  • Flag: Singapore

  • Build year: 1976 (Japan)

  • FPSO conversion: 1999 (Singapore)
     

  • Oil production capacity: 40,000 b/d

  • Gas production capacity: 8.0 mmcf/d

  • Water production capacity: 30,000 b/d

  • Total storage capacity: 758,888 bbls

Full technical specifications can be found here

Jasmine.png
bottom of page